What happens when
Your renovation, step by step
Ten steps from the first phone call to the walk-through. For each one: what happens, what you need to do, and whether you can still use the room. Pick your room to see the steps that change.
- Steps 1 to 4: planning, at your pace. The room still works.
- Steps 5 to 9: on site. The room is out of action.
- Step 10: it’s yours again
-
Planning
You get in touch
Call 0468 511 068, Monday to Friday, 9 am to 5 pm, or send the short form with a few details. If you’ve used the cost guide, your choices come with it.
-
Planning
A look at the room and a measure-up
A visit to see the room, measure it properly and talk through what you want, what’s possible and roughly what it costs. It’s also when the floor, the walls and the waste are checked, because they decide what the new layout can do.The sink, the cooktop and the power points are noted, because moving them is what changes the price most.The taps, the waste and the machines’ sizes are noted, so the new cabinetry fits around them.
-
Planning
Your quote
A free quote for the work, so you can see what’s included before you decide. Any part that can’t be known until the walls are open, such as hidden rot, is talked through up front.
-
Planning
Choices and a start date
Tiles, vanity, tapware, toilet and glass are settled.Cabinet colours, benchtop, splashback, handles, sink and appliances are settled.Cabinet colours, benchtop, tub and tapware are settled. Then a start date is booked, with everything ordered in time.
-
On site
Protect and strip out
Floors and the path in are covered, then the old room comes out: tiles, bath, vanity and fittings, back to the frame and the slab.cupboards, benchtops, splashback and old appliances.tub, cupboards and old tiles. The rubbish goes with it. In homes built before 1990, old sheeting is checked for asbestos first.
-
On site
Frame, pipes and wiring
With the walls open, the framing is checked, repaired and straightened, and noggins go in where cabinets, rails or a wall-hung vanity will hang. New pipes, wastes and wiring go where the new layout needs them, by licensed trades.
-
On site
Sheeting and waterproofingWalls patched and sheeted
Wet-area board goes up, and the waterproof membrane goes on across the floor, up the walls and to 1800 mm in the shower. It has to cure properly before any tile goes near it.Wet-area board goes up where the tub and machines sit, and the floor and the wall behind the tub are waterproofed.New gyprock where the old cupboards came off, joints set and sanded, ready for paint and the new cabinetry.
-
On site
TilingCabinetry and benchtopsCabinetry and tiling
Floor tiles are laid to fall to the drain and the walls are tiled, with any niche set in. Then the grout, and silicone in the corners where it moves.The cabinets are set level and fixed, then the benchtop is measured off the cabinets themselves so it fits exactly. Stone and porcelain tops are made to that measure, which takes a little time.The cabinets go in level and the benchtop goes on, then the splashback and floor are tiled and grouted.
-
On site
Fit-off
The vanity, tapware, toilet, shower glass, mirror and towel rails go in, and the lights and fan are connected.The sink, tapware and appliances go in, the splashback goes up, and the doors and handles are fitted and adjusted.The tub, tapware and machines are connected, and the doors and handles are fitted and adjusted. Then the painting and the last touch-ups.
-
Done
Clean, walk-through and handover
The room is cleaned and you walk through it together: how things work, how to look after them, and anything you’d like adjusted. Based in Warana, so if something needs a look later, it isn’t far.
How long each step takes depends on the room and the choices. Your quote gives the timing for your job.
Questions
What people ask before they start
Do I need to move out?
Almost never for one room. The room being worked on is out of action, and there’s some noise and dust, but the rest of the house carries on.
What if it’s our only bathroom?
Say so when you get in touch. How you’ll shower while the work is on is planned at the choices stage, before anything comes out.
Who does the plumbing and electrical?
Licensed plumbers and electricians, as Queensland law requires. They’re organised as part of the job, so you don’t need to find your own.
Is a bathroom waterproofed to a standard?
Yes. In Queensland, wet areas are waterproofed to the Australian Standard for wet areas (AS 3740), and the membrane goes to at least 1800 mm high in the shower.
Can I see how much it might cost first?
Yes. The cost guide gives a ballpark in about a minute. Your quote after the measure-up gives the real number, free.
Ready for step one?
Call 0468 511 068, Monday to Friday, 9 am to 5 pm, or send a few details for a free quote.